Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Mont Orignal Express



General information  
Place Lac-Etchemin 
resort Mont Orignal 
Region Québec 
Country   
Name of lift Mont Orignal Express 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1991 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
The world´s first 6-CLD.

geometric data  
Height of valley station ?? m
Height of mountain station ?? m
Vertical rise 228,5 m
Route distance 1036 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,4 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 (3200) Pers/h
Travel time 4,3 min
Driving speed line 4,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 300 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating ?? 
Seat heater no 
Persons per cab
Number of cabs 61 (80) Stk
Cab distance 36,12 (27,09) m
Cab interval 9 (6,75) s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Situation of entrance parallel 
Situation of exit ?? 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Aug 4, 2020
PHOTOS: ??

Lift-Statistics
4416 visit(s) since Nov 26, 2004
Last visit Nov 7, 2025

LIFT-WORLD IDs
Lift-ID: 164
Place-ID: 2894

https://www.seilbahntechnik.net/en/lifts/164/datas.htm