Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Matterhorn-Express I (Zermatt - Furi)












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Zermatt
resort
Region Valais
Country CH Switzerland, Confoederatio Helvetica
Name of lift Matterhorn-Express I (Zermatt - Furi) 
Type 8-MGD 
Lift manufacturer Garaventa 
Year of construction 2002 
Commissioning date ??

geometric data  
Height of valley station 1638 m
Height of mountain station 1871 m
Vertical rise 233 m
Route distance 1637 m
Horizontal length ?? m
Average incline 14,2 %
Largest incline ?? %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 4,55 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Frey 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 726 kW
Drive power (Operation) 514 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model OMEGA III-8
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 65 Stk
Cab distance ?? m
Cab interval 10,3 s
Garage type ground floor
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs 34,000,000  CHF 
Currency (Construction costs) Swiss franc 
Construction period 7 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 06/06/21 08:06:11
PHOTOS: ????

Lift-Statistics
16911 visit(s) since 21/11/02
Last visit 12/06/21

LIFT-WORLD IDs
Lift-ID: 1651
Place-ID: 2017

https://www.seilbahntechnik.net/en/lifts/1651/datas.htm