Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Piz Mundaun

Line
Line

General information  
Place Surcuolm 
resort Obersaxen Mundaun 
Region Grisons 
Country   
Name of lift Piz Mundaun 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 1997 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1590 m
Height of middle station(s) ?? m
Height of mountain station 2058 m
Vertical rise 468 m
Route distance 1356 m
Horizontal length 1273 m
Average incline 36,8 %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 4,83 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 106 
Cab manufacturer Doppelmayr 
Cab model ?? 
Seating none 
Seat heater no 
Persons per cab
Number of cabs 49 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: Apr 13, 2025
PHOTOS: ??

Lift-Statistics
6602 visit(s) since Jan 12, 2005
Last visit May 13, 2025

LIFT-WORLD IDs
Lift-ID: 167
Place-ID: 2023

https://www.seilbahntechnik.net/en/lifts/167/datas.htm