Lift-Database
Lifts in the world
10-MGD Gipfelbahn Hochwurzen

Valley Station

Mountain Station

Line
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Sorry, no information available. |
General information | |
---|---|
Place | Rohrmoos-Untertal |
resort | Schladming Dachstein Tauern |
Region | Styria, Steiermark |
Country | ![]() |
Name of lift | Gipfelbahn Hochwurzen |
Type | 10-MGD |
Lift manufacturer | Leitner |
Year of construction | 2013 |
Commissioning date | ?? |
geometric data | |
---|---|
Height of valley station | 1134 m |
Height of mountain station | 1841 m |
Vertical rise | 707 m |
Route distance | 2169 m |
Horizontal length | ?? m |
Average incline | 34,51 % |
Largest incline | ?? % |
Number of pillars | 14 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2539 Pers/h |
Travel time | 6,2 min |
Driving speed line | 6,0 m/s |
Driving speed station | ?? m/s |
rope data | |
---|---|
Rope manufacturer | Teufelberger |
Length of haul rope | 4190 m |
Total weight of haul rope | 41900 t |
Haul rope diameter | 54 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
electrical data | |
---|---|
Electrical control | Leitner |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 1 Stk |
Drive power (Start) | 855 kW |
Drive power (Operation) | 700 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | direct drive |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | LPA |
Cab manufacturer | Carvatech |
Cab model | ?? |
Seating | carpet |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 10 |
Number of cabs | 59 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
Garage type | underground |
Garage place | valley station |
Garage direction | forward |
Loading direction | forward |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | right |
Construction costs | ?? ?? |
Currency (Construction costs) | ?? |
Construction period | 3,5 months |
Seasontime | ❄ ☀ all-season |
Evacuation ropeway | no |
Integrated rescue system | ?? |
Rope position control | yes |
Asset number (Trail map) | ?? |
Updates
Datas: 06/01/21 13:30:48
PHOTOS: 13/12/15 18:26:27
Lift-Statistics
11863 visit(s) since 12/12/13
Last visit 08/03/21
LIFT-WORLD IDs
Lift-ID: 17115
Place-ID: 527
https://www.seilbahntechnik.net/en/lifts/17115/datas.htm
Datas: 06/01/21 13:30:48
PHOTOS: 13/12/15 18:26:27
Lift-Statistics
11863 visit(s) since 12/12/13
Last visit 08/03/21
LIFT-WORLD IDs
Lift-ID: 17115
Place-ID: 527
https://www.seilbahntechnik.net/en/lifts/17115/datas.htm