Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Kappe












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Winterberg
resort
Region North Rhine-Westphalia, Nordrhein-Westfalen
Country DE Germany, Deutschland
Name of lift Kappe 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2013 
Commissioning date 24/12/13

geometric data  
Height of valley station 603 m
Height of mountain station 782 m
Vertical rise 179 m
Route distance 562 m
Horizontal length ?? m
Average incline ?? %
Largest incline 50 %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2700 Pers/h
Travel time 2,7 min
Driving speed line 4,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 40 Stk
Cab distance 36 m
Cab interval 8 s
Garage type station circulation
Garage place valley and mountain
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 7 months
Seasontime ❄ ☀ all-season
Situation of entrance parallel
Situation of exit 90°
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) 14 




This information are for members only visible!



Updates
Datas: 28/10/18 06:22:50
PHOTOS: 07/02/14 10:05:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
7427 visit(s) since 18/12/13
Last visit 17/10/19

LIFT-WORLD IDs
Lift-ID: 17138
Place-ID: 1985

https://www.seilbahntechnik.net/en/lifts/17138/datas.htm