General information  
Place Crest-Voland 
resort Espace Diamant 
Region Rhône-Alpes 
Country   
Name of lift Bâches / Nant Rouge 
Type 4-CLF 
Lift manufacturer Poma 
Year of construction 2013 
Commissioning date 2013 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1556 m
Height of middle station(s) 1475 m
Height of mountain station 1607 m
Vertical rise 51 m
Route distance 1588 m
Horizontal length 1572 m
Average incline 13 %
Largest incline 34 %
Number of pillars 14 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,9 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time ?? min
Driving speed line 2,3 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 209 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 145 Stk
Cab distance 22,08 m
Cab interval 9,6 s


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 20 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 30/12/17
PHOTOS: ??

Lift-Statistics
7172 visit(s) since 01/01/14
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 17157
Place-ID: 1010

https://www.seilbahntechnik.net/en/lifts/17157/datas.htm