Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  60-AT Grünbergbahn

Valley station and cabin 1
Valley station and cabin 1

General information  
Place Gmunden 
resort ?? 
Region Upper Austria 
Country   
Name of lift Grünbergbahn 
Type 60-AT 
Lift manufacturer Steurer 
Year of construction 2013/14 
Commissioning date 14/06/14 


Infos for handicapped persons
step-free

Characteristics
Track gauge valley station: 90cm
Track gauge support 1: 10.25m

Regular operation without car attendant with a capacity of 45 persons and maximum speed of 7m/s

fold-out sliding platforms in the valley station

geometric data  
Height of valley station 435,75 m
Height of mountain station 986,64 m
Vertical rise 550,89 m
Route distance 2030,71 m
Horizontal length 1949,13 m
Average incline 28,26 %
Largest incline 57,06 %
Number of pillars 2 Stk
Greatest spanwidth 1440 m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 620 Pers/h
Travel time 6 min
Driving speed line 10 m/s
Speed on towers 8 m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 593 kW
Drive power (Operation) 325 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Carvatech 
Cab model ?? 
Heater ?? 
Aircon ?? 
Persons per cab 60 
Number of cabs 2 Stk
Carriage Operator ?? 


rope data  
Rope manufacturer Teufelberger 
Length of carrying rope 2250 m
Length of traction rope 4240 m
Length of counter-rope ?? m
Total weight of carrying rope ?? t
Total weight of traction rope ?? t
Total weight of counter-rope ?? t
Carrying rope diameter 46 mm
Traction rope diameter 28 mm
Counter-rope diameter ?? mm
Nominal strength of carrying rope ?? N/mm²
Nominal strength of traction rope ?? N/mm²
Nominal strength of counter-rope ?? N/mm²
Breaking strength of carrying rope ?? kN
Breaking strength of traction rope ?? kN
Breaking strength of counter-rope ?? kN
Tensionstation carryingrope ?? 
Tensionstation tractionrope Valley station 
Tension type rope tension weight 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 10 months
Seasontime summer 
xxxx hier text hin xxxx no 
Moving platform no 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/12/23
PHOTOS: ??

Lift-Statistics
10475 visit(s) since 17/05/14
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 17262
Place-ID: 412

https://www.seilbahntechnik.net/en/lifts/17262/datas.htm