Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD/B Prima Express


Valley Station
Valley Station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Jáchymov
resort Klínovec ski area
Region Karlovarský kraj
Country CZ Czech republic, Česká republika
Name of lift Prima Express 
Type 4-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2012/14 
Commissioning date 06/12/14

geometric data  
Height of valley station 776 m
Height of mountain station 1234 m
Vertical rise 458 m
Route distance 2168 m
Horizontal length 2104 m
Average incline ?? %
Largest incline ?? %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 7,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) ?? kW
Drive power (Operation) 466 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Bubble colour orange
Seating Icolan
Seat heater no
Persons per cab
Number of cabs 151 Stk
Cab distance 30 m
Cab interval 6,0 s
Garage type ground floor
Garage place mountain station
Garage direction backward
Loading direction ??

miscellaneous data  
Transport uphill 90 %
Transport downhill 10 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 30 months
Seasontime ❄ ☀ all-season
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map)




This information are for members only visible!



Updates
Datas: 02/01/17 17:15:56
PHOTOS: 28/06/14 09:41:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
6135 visit(s) since 15/06/14
Last visit 10/04/20

LIFT-WORLD IDs
Lift-ID: 17319
Place-ID: 356

https://www.seilbahntechnik.net/en/lifts/17319/datas.htm