Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Sonntagskogel II

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Wagrain 
resort ?? 
Region Salzburg 
Country   
Name of lift Sonntagskogel II 
Type 4-CLF 
Lift manufacturer Girak-Garaventa 
Year of construction 2002 
Commissioning date ?? 
Date of closing down 15/04/18 
Date of pull down 19/04/18 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1601 m
Height of mountain station 1732 m
Vertical rise 131 m
Route distance 407 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 6 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2363 Pers/h
Travel time ?? min
Driving speed line 2,6 m/s

electrical data  
Electrical control STG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Garaventa 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 50 Stk
Cab distance ?? m
Cab interval ?? s


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? ATS
Currency (Construction costs) Austrian schilling 
Construction period 4 months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/11/23
PHOTOS: ??

Lift-Statistics
22263 visit(s) since 12/05/03
Last visit 21/12/24

LIFT-WORLD IDs
Lift-ID: 1767
Place-ID: 213

https://www.seilbahntechnik.net/en/lifts/1767/datas.htm