Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Plan Joran







General information  
Place Argentière 
resort ?? 
Region Rhône-Alpes 
Country   
Name of lift Plan Joran 
Type 10-MGD 
Lift manufacturer Poma 
Year of construction 2014 
Commissioning date 12.12.2014 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1252 m
Height of mountain station 2137 m
Vertical rise 885 m
Route distance 2315 m
Horizontal length 2136 m
Average incline 42 %
Largest incline 85 %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,9 m
Trackwidth line 6,1 m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 6,7 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system Semer 
Number of drive 2 Stk
Drive power (Start) 1680 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model DIAMOND - C10D210 
Seating leather 
Seat heater ?? 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 84 Stk
Cab distance 67,5 m
Cab interval 11,25 s
Garage type ?? 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 58 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27.07.2022
PHOTOS: ??

Lift-Statistics
8476 visit(s) since 16.11.2014
Last visit 19.04.2025

LIFT-WORLD IDs
Lift-ID: 17699
Place-ID: 948

https://www.seilbahntechnik.net/en/lifts/17699/datas.htm