  6-CLD/B Gamskogelbahn II










General information  
Place Zauchensee 
resort ?? 
Region Salzburg 
Country   
Name of lift Gamskogelbahn II 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2014 
Commissioning date 12/12/14 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1856 m
Height of mountain station 2100 m
Vertical rise 246 m
Route distance 865 m
Horizontal length ?? m
Average incline ?? %
Largest incline 60,65 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2600 Pers/h
Travel time ?? min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Siemens 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive diesel engine 
Traction of emergency drive hydrostatic 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model 6E98/B 
Bubble colour neutral 
Seating leather 
Seat heater yes 
Persons per cab
Number of cabs 48 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction backward 
Loading direction forward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 3 months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 25/04/23
PHOTOS: ??

Lift-Statistics
21003 visit(s) since 16/11/14
Last visit 07/12/24

LIFT-WORLD IDs
Lift-ID: 17712