Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Loze Express









Infos for handicapped persons
Sorry, no information available.

Characteristics
second-hand Lift from Courchevel (former Biollay), towers and Alpha-station from old lift

General information  
Place Meribel
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Loze Express 
Type 4-CLD 
Lift manufacturer Poma 
Year of construction 2014 
Commissioning date 2014

geometric data  
Height of valley station 1752 m
Height of mountain station 2239 m
Vertical rise 487 m
Route distance 1425 m
Horizontal length 1323 m
Average incline 37 %
Largest incline 65 %
Number of pillars 16 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 4,97 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Redaelli 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 332 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive gas engine
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Poma
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 84 Stk
Cab distance 36 m
Cab interval 7,2 s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 20 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 01/01/17 18:56:11
PHOTOS: 25/04/15 08:52:15

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
5911 visit(s) since 16/11/14
Last visit 19/09/19

LIFT-WORLD IDs
Lift-ID: 17718
Place-ID: 1130

https://www.seilbahntechnik.net/en/lifts/17718/datas.htm