Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Plan de l`Eau


Valley Station
Valley Station

Mountain Station
Mountain Station

Complete view of the lift
Complete view of the lift


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Val Thorens
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Plan de l`Eau 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2014 
Commissioning date 2014

geometric data  
Height of valley station 1822 m
Height of middle station(s) ?? m
Height of mountain station 2513 m
Vertical rise 690 m
Route distance 1975 m
Horizontal length 1862 m
Average incline 37 %
Largest incline 66 %
Number of pillars 17 Stk
Greatest spanwidth 204 m
Max ground clearance 22 m
Trackwidth drive 4,9 m
Trackwidth line 6,1 m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2600 Pers/h
Travel time 5,98 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope 191 kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 2 Stk
Drive power (Start) 918 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA
Cab manufacturer Poma
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 91 Stk
Cab distance 45,65 m
Cab interval 8,3 s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 19/03/17 14:38:36
PHOTOS: 03/05/15 11:35:02

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
5880 visit(s) since 16/11/14
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 17735
Place-ID: 1234

https://www.seilbahntechnik.net/en/lifts/17735/datas.htm