Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLD Vonnes - Super Châtel (Gabelou)



General information  
Place Châtel 
resort Portes du Soleil 
Region Rhône-Alpes 
Country   
Name of lift Vonnes - Super Châtel (Gabelou) 
Type 4-CLD 
Lift manufacturer Poma 
Year of construction 2014 
Commissioning date ?? 
Second-hand lift. Formerly lift no. 7368 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-hand Lift from Avoriaz (former Proclou)

geometric data  
Height of valley station 1264 m
Height of mountain station 1270 m
Vertical rise 6 m
Route distance 992 m
Horizontal length 953 m
Average incline 0,63 %
Largest incline 78 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,0 m
Trackwidth line 5,0 m
Trackwidth return 4,1 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time ?? min
Driving speed line 4,6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system Semer 
Number of drive ?? Stk
Drive power (Start) 530 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type Omega T 
Cab manufacturer ?? 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 57 Stk
Cab distance 36,8 m
Cab interval 8 s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 41 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??  
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/05/20
PHOTOS: ??

Lift-Statistics
6448 visit(s) since 06/12/14
Last visit 14/04/24

LIFT-WORLD IDs
Lift-ID: 17750
Place-ID: 994

https://www.seilbahntechnik.net/en/lifts/17750/datas.htm