Lift-Database » Lifts in the world
2-SL San Spiert - Clüx

Mountain Station
| General information | |
|---|---|
| Place | Pontresina |
| resort | ?? |
| Region | Grisons |
| Country | |
| Name of lift | San Spiert - Clüx |
| Type | 2-SL |
| Lift manufacturer | BMF |
| Year of construction | 2012 |
| Commissioning date | 19.12.2012 |
| Infos for handicapped persons |
|---|
| Sorry, no information available. |
| Characteristics |
|---|
| nothing |
| geometric data | |
|---|---|
| Height of valley station | 1843,5 m |
| Height of middle station(s) | ?? m |
| Height of mountain station | 1920,1 m |
| Vertical rise | 76,6 m |
| Route distance | 324 m |
| Horizontal length | 314 m |
| Average incline | ?? % |
| Largest incline | ?? % |
| Number of pillars | 4 Stk |
| Trackwidth drive | 3,2 m |
| Trackwidth line | 3,2 m |
| Trackwidth return | 3,2 m |
| Angle of wrap (drive wheel) | 179,2 ° |
| Drive altitude of site | 2 m |
| Maximum capacity | 950 Pers/h |
| Travel time | 2,08 min |
| Driving speed line | 2,6 m/s |
| electrical data | |
|---|---|
| Electrical control | SISAG |
| Remote control and telemonitoring system | SISAG |
| Power control system | SISAG |
| Number of drive | 1 Stk |
| Drive power (Start) | 45 kW |
| Drive power (Operation) | 30 kW |
| Brake power | ?? kW |
| Continuous brake power | ?? kW |
| Driving station | Valley station |
| Drive type | electrical |
| Traction of drive | electromechanical |
| cabins data | |
|---|---|
| Grip type | 2FG |
| Cab manufacturer | LST |
| Cab model | ?? |
| Persons per cab | 2 |
| Number of cabs | 33 Stk |
| rope data | |
|---|---|
| Rope manufacturer | Fatzer |
| Length of haul rope | 656 m |
| Total weight of haul rope | 0,7 t |
| Haul rope diameter | 18 mm |
| Nominal strength of haul rope | 1960 N/mm² |
| Breaking strength of rope | 214,9 kN |
| Tensionstation haulrope | Valley station |
| Tension type | hydraulical (controlled) |
| Tension way | 2,5 m |
| miscellaneous data | |
|---|---|
| Transport uphill | 100 % |
| Transport downhill | ?? % |
| Drive direction | left |
| Construction costs | ?? |
| Currency (Construction costs) | ?? |
| Construction period | 3 months |
| Seasontime | ❄ winter |
| Autonomous ropeway | no |
| Asset number (Trail map) | A |
Updates
Datas: 20.08.2022
PHOTOS: ??
Lift-Statistics
5879 visit(s) since 08.03.2015
Last visit 07.12.2025
LIFT-WORLD IDs
Lift-ID: 17872
Place-ID: 393
https://www.seilbahntechnik.net/en/lifts/17872/datas.htm
Datas: 20.08.2022
PHOTOS: ??
Lift-Statistics
5879 visit(s) since 08.03.2015
Last visit 07.12.2025
LIFT-WORLD IDs
Lift-ID: 17872
Place-ID: 393
https://www.seilbahntechnik.net/en/lifts/17872/datas.htm

Deutsch
English
Français
Italiano
Česky
Nederlands

