Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Combes





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Méribel-Mottaret
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Combes 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2015 
Commissioning date 2015

geometric data  
Height of valley station 1687 m
Height of middle station(s) 1967 m
Height of mountain station 2169 m
Vertical rise 482 m
Route distance 1331 m
Horizontal length ?? m
Average incline 38,71 %
Largest incline 93 %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,9 m
Trackwidth line ?? m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 4,0 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 890 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA
Cab manufacturer Poma
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 76 Stk
Cab distance 39,6 m
Cab interval 7,2 s
Garage type emergency rail
Garage place mountain station
Garage direction backward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 33 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 05/01/17 14:07:18
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
1990 visit(s) since 17/10/16
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 18122
Place-ID: 1131

https://www.seilbahntechnik.net/en/lifts/18122/datas.htm