Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Gant - Blauherd (Hublot-Express)





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Zermatt
resort
Region Valais
Country CH Switzerland, Confoederatio Helvetica
Name of lift Gant - Blauherd (Hublot-Express) 
Type 6-CLD 
Lift manufacturer Garaventa 
Year of construction 2016 
Commissioning date 25/11/16

geometric data  
Height of valley station 2226 m
Height of mountain station 2604 m
Vertical rise 378 m
Route distance 954 m
Horizontal length ?? m
Average incline 43,85 %
Largest incline 87,56 %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,10 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 3,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope 1968 m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 379 kW
Drive power (Operation) 297 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type DT 108
Cab manufacturer Garaventa
Cab model 6E98
Seating leather
Seat heater no
Persons per cab
Number of cabs 36 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place mountain station
Garage direction forward
Loading direction backward

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction left
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 16/11/20 07:47:28
PHOTOS: ????

Lift-Statistics
4320 visit(s) since 23/12/16
Last visit 15/10/21

LIFT-WORLD IDs
Lift-ID: 18210
Place-ID: 2017

https://www.seilbahntechnik.net/en/lifts/18210/datas.htm