Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Schönleitenbahn I






Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Saalbach
resort Skicircus
Region Salzburg
Country AT Austria, Österreich
Name of lift Schönleitenbahn I 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2016 
Commissioning date 03/12/16

geometric data  
Height of valley station 943 m
Height of mountain station 1488 m
Vertical rise 549 m
Route distance 1568 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,4 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3200 Pers/h
Travel time 5,66 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 715 kW
Drive power (Operation) 599 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive direct drive
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model ??
Seating ??
Seat heater ??
Heater no
Aircon no
Persons per cab 10 
Number of cabs 60 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction ??
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 8 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 24/07/18 20:48:35
PHOTOS: 23/01/19 19:07:28

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
4159 visit(s) since 12/04/17
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 18303
Place-ID: 295

https://www.seilbahntechnik.net/en/lifts/18303/datas.htm