Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Schönleitenbahn II










General information  
Place Saalbach 
resort Ski Alpin Card 
Region Salzburg 
Country   
Name of lift Schönleitenbahn II 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2016 
Commissioning date 03/12/16 


Infos for handicapped persons
Sorry, no information available.

Characteristics
2024: Increase in travelling speed by 0.2 m/s and 7 additional cabins (for both sections together)

geometric data  
Height of valley station 1488 m
Height of mountain station 1907 m
Vertical rise 419 m
Route distance 1199 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,4 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3520 Pers/h
Travel time ?? min
Driving speed line 6,2 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 683 kW
Drive power (Operation) 560 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive direct drive 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model ?? 
Seating carpet 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 119 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place valley station 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) I2 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 12/12/24
PHOTOS: ??

Lift-Statistics
10490 visit(s) since 12/04/17
Last visit 21/12/24

LIFT-WORLD IDs
Lift-ID: 18304
Place-ID: 295

https://www.seilbahntechnik.net/en/lifts/18304/datas.htm