Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD Roc de Tougne


Complete View of the lift
Complete View of the lift

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Méribel-Mottaret
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Roc de Tougne 
Type 6-CLD 
Lift manufacturer ??
Year of construction 2017 
Commissioning date ??

geometric data  
Height of valley station 2143 m
Height of mountain station 2543 m
Vertical rise 400 m
Route distance 1158 m
Horizontal length 1083 m
Average incline 36,9 %
Largest incline 59,1 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 6,1 m
Trackwidth line 6,1 m
Trackwidth return 6,1 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 3,86 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 416 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 57 Stk
Cab distance 45 m
Cab interval 9 s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 8 months
Seasontime winter
Situation of entrance ??
Situation of exit ??
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 04/01/19 22:13:50
PHOTOS: 05/01/19 19:47:07

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
1386 visit(s) since 26/11/17
Last visit 21/09/19

LIFT-WORLD IDs
Lift-ID: 18454
Place-ID: 1131

https://www.seilbahntechnik.net/en/lifts/18454/datas.htm