Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-CLD/B Seekarspitzbahn












Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Obertauern
resort Lungo
Region Salzburg
Country AT Austria, Österreich
Name of lift Seekarspitzbahn 
Type 8-CLD/B 
Lift manufacturer Leitner 
Year of construction 2017 
Commissioning date 23/12/17

geometric data  
Height of valley station 1807 m
Height of mountain station 2203 m
Vertical rise 396 m
Route distance 1482 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 17 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2600 Pers/h
Travel time ?? min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Leitner 
Remote control and telemonitoring system ??
Power control system Leitner 
Number of drive 1 Stk
Drive power (Start) 794 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive direct drive
Emergency drive hydraulic
Traction of emergency drive hydrostatic

cabins data  
Grip type LPA-L
Cab manufacturer Leitner
Cab model ??
Bubble colour neutral
Seating leather
Seat heater yes
Persons per cab
Number of cabs 48 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground
Garage place mountain station
Garage direction backward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 8 months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system ??
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 07/04/19 20:13:22
PHOTOS: 11/04/19 17:59:38

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
4974 visit(s) since 25/11/17
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 18466
Place-ID: 81

https://www.seilbahntechnik.net/en/lifts/18466/datas.htm