Lift-Database » Lifts in the world
4-CLF Zweiländer
General information | |
---|---|
Place | Oberstdorf |
resort | Nebelhorn |
Region | Bavaria |
Country | |
Name of lift | Zweiländer |
Type | 4-CLF |
Lift manufacturer | Leitner |
Year of construction | 2001 |
Commissioning date | 15/12/01 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Sorry, no information available. |
geometric data | |
---|---|
Height of valley station | 1751 m |
Height of mountain station | 1944 m |
Vertical rise | 192 m |
Route distance | 584 m |
Horizontal length | 542 m |
Average incline | 35,4 % |
Largest incline | ?? % |
Number of pillars | 7 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | 5,3 m |
Trackwidth line | 5,3 m |
Trackwidth return | 5,3 m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2407 Pers/h |
Travel time | 4 min |
Driving speed line | 2,4 m/s |
electrical data | |
---|---|
Electrical control | Leitner |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | 1 Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | 167 kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | Mountain station |
Drive type | electrical |
Traction of drive | electromechanical |
Emergency drive | diesel engine |
Traction of emergency drive | hydrostatic |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | Leitner |
Cab model | ?? |
Seating | polystyrene |
Seat heater | no |
Persons per cab | 4 |
Number of cabs | 83 Stk |
Cab distance | 14,5 m |
Cab interval | 6,0 s |
rope data | |
---|---|
Rope manufacturer | Fatzer |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | 38 mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | Valley station |
Tension type | hydraulical (controlled) |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | ?? % |
Drive direction | left |
Construction costs | ?? DEM |
Currency (Construction costs) | Deutsche Mark |
Construction period | ?? months |
Seasontime | ❄ winter |
Loading carpet | yes |
Evacuation ropeway | no |
Integrated rescue system | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 19/01/24
PHOTOS: ??
Lift-Statistics
14401 visit(s) since 24/11/02
Last visit 04/12/24
LIFT-WORLD IDs
Lift-ID: 1858
Place-ID: 152
https://www.seilbahntechnik.net/en/lifts/1858/datas.htm
Datas: 19/01/24
PHOTOS: ??
Lift-Statistics
14401 visit(s) since 24/11/02
Last visit 04/12/24
LIFT-WORLD IDs
Lift-ID: 1858
Place-ID: 152
https://www.seilbahntechnik.net/en/lifts/1858/datas.htm