Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Peter Anich II



General information  
Place Oberperfuss 
resort ?? 
Region Tyrol 
Country   
Name of lift Peter Anich II 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2017 
Commissioning date 12 / 2017 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1363 m
Height of mountain station 1650 m
Vertical rise 287 m
Route distance 1615 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1300 (1470) Pers/h
Travel time 6 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Carvatech 
Cab model ?? 
Seating ?? 
Seat heater ?? 
Heater no 
Aircon no 
Persons per cab
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation 
Garage place valley and mountain 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 4 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/12/24
PHOTOS: ??

Lift-Statistics
5690 visit(s) since 20/05/18
Last visit 21/12/24

LIFT-WORLD IDs
Lift-ID: 18583
Place-ID: 507

https://www.seilbahntechnik.net/en/lifts/18583/datas.htm