Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Coulouvrier



General information  
Place Morillon 
resort Grand Massif 
Region Rhône-Alpes 
Country   
Name of lift Coulouvrier 
Type 6-CLD 
Lift manufacturer Doppelmayr 
Year of construction 2017 
Commissioning date 2017 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1163 m
Height of mountain station 2108 m
Vertical rise 945 m
Route distance 2848 m
Horizontal length 2687 m
Average incline 35,1 %
Largest incline 86 %
Number of pillars 21 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 6,1 m
Trackwidth line 6,1 m
Trackwidth return 6,1 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 9,5 min
Driving speed line 5,25 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SEIREL 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 2 Stk
Drive power (Start) ?? kW
Drive power (Operation) 1600 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive hydraulic 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Doppelmayr 
Cab model 6E98 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 157 Stk
Cab distance 43,2 m
Cab interval 8,1 s
Garage type emergency rail 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 54 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Autonomous ropeway no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 18 jan 2025
PHOTOS: ??

Lift-Statistics
3530 visit(s) since 5 nov 2018
Last visit 30 jul 2025

LIFT-WORLD IDs
Lift-ID: 18677
Place-ID: 1143

https://www.seilbahntechnik.net/en/lifts/18677/datas.htm