Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Schlossalmbahn I









Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Bad Hofgastein
resort Ski amadé
Region Salzburg
Country AT Austria, Österreich
Name of lift Schlossalmbahn I 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2018 
Commissioning date 01/12/18

geometric data  
Height of valley station 852 m
Height of mountain station 1307 m
Vertical rise 455 m
Route distance 1274,72 m
Horizontal length 1190,64 m
Average incline 38,24 %
Largest incline ?? %
Number of pillars 8 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 5 m
Trackwidth line 6,2 m
Trackwidth return 6,2 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3015 Pers/h
Travel time 3,70 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 56 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 6 m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive 1 Stk
Drive power (Start) 726 kW
Drive power (Operation) 569 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type A104C
Cab manufacturer CWA
Cab model ??
Seating leather
Seat heater yes
Heater no
Aircon no
Persons per cab 10 
Number of cabs 50 Stk
Cab distance 71,64 m
Cab interval 11,94 s
Garage type ground floor
Garage place valley station
Garage direction forward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system yes
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 10/04/19 07:39:11
PHOTOS: 11/01/19 17:20:48

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
1821 visit(s) since 07/12/18
Last visit 24/08/19

LIFT-WORLD IDs
Lift-ID: 18683
Place-ID: 245

https://www.seilbahntechnik.net/en/lifts/18683/datas.htm