Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Kirchenkarbahn II





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Hochgurgl
resort Obergurgl-Hochgurgl
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Kirchenkarbahn II 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2018 
Commissioning date 2018

geometric data  
Height of valley station 2629 m
Height of mountain station 2839 m
Vertical rise 210 m
Route distance 518 m
Horizontal length ?? m
Average incline 44,15 %
Largest incline ?? %
Number of pillars 3 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2440 Pers/h
Travel time 1,56 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control Frey 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 377 kW
Drive power (Operation) 314 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model Omega IV-10 SI D
Seating leather
Seat heater yes
Heater no
Aircon no
Persons per cab 10 
Number of cabs 17 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime winter
Evacuation ropeway no
Integrated rescue system yes
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 16/02/19 18:07:24
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
1472 visit(s) since 09/12/18
Last visit 22/07/19

LIFT-WORLD IDs
Lift-ID: 18717
Place-ID: 61

https://www.seilbahntechnik.net/en/lifts/18717/datas.htm