Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Corbier



General information  
Place Le Corbier 
resort Les Sybelles 
Region Rhône-Alpes 
Country   
Name of lift Corbier 
Type 6-CLD 
Lift manufacturer BMF 
Year of construction 2018 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1695,7 m
Height of mountain station 2266,01 m
Vertical rise 570,29 m
Route distance 1754,4 m
Horizontal length 1645,7 m
Average incline 34,67 %
Largest incline 66,14 %
Number of pillars 15 Stk
Greatest spanwidth 181 m
Max ground clearance 18 m
Trackwidth drive 4,9 m
Trackwidth line 6,0 m
Trackwidth return 5,8 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3000 Pers/h
Travel time 4,87 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 821,6 kW
Drive power (Operation) 685,1 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating ?? 
Seat heater ?? 
Persons per cab
Number of cabs 86 Stk
Cab distance 42,79 m
Cab interval 7,13 s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope 3512,83 m
Total weight of haul rope 27 t
Haul rope diameter 46 mm
Nominal strength of haul rope 2060 N/mm²
Breaking strength of rope 1526,7 kN
Tensionstation haulrope Valley station 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction ?? 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ??  
Situation of entrance ?? 
Situation of exit ?? 
Loading carpet ?? 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 14/06/20
PHOTOS: ??

Lift-Statistics
3930 visit(s) since 19/12/18
Last visit 20/12/24

LIFT-WORLD IDs
Lift-ID: 18749
Place-ID: 1077

https://www.seilbahntechnik.net/en/lifts/18749/datas.htm