Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Oberdamüls


Valley Station
Valley Station

Mountain Station
Mountain Station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Damuels
resort Mellau-Damuels
Region Vorarlberg
Country AT Austria, Österreich
Name of lift Oberdamüls 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 2018 
Commissioning date 14/12/18

geometric data  
Height of valley station 1450 m
Height of mountain station 1750 m
Vertical rise 300 m
Route distance 1400 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 4,2 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 2800 m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model CS10
Bubble colour neutral
Seating ??
Seat heater yes
Persons per cab
Number of cabs 67 Stk
Cab distance ?? m
Cab interval ?? s
Garage type station circulation
Garage place valley and mountain
Garage direction forward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 6 months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet yes
Evacuation ropeway no
Integrated rescue system no
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 14/03/19 20:06:59
PHOTOS: 17/03/19 12:15:15

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
1440 visit(s) since 27/12/18
Last visit 21/08/19

LIFT-WORLD IDs
Lift-ID: 18760
Place-ID: 38

https://www.seilbahntechnik.net/en/lifts/18760/datas.htm