Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Fojtský grúň

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Mosty u Jablunkova 
resort ?? 
Region Moravskoslezský kraj 
Country   
Name of lift Fojtský grúň 
Type 4-CLF 
Lift manufacturer Leitner 
Year of construction 2018 
Commissioning date ?? 
Second-hand lift. Formerly lift no. 16191 


Infos for handicapped persons
Sorry, no information available.

Characteristics
second-Hand Lift

geometric data  
Height of valley station 542 m
Height of middle station(s) ?? m
Height of mountain station 681 m
Vertical rise 139 m
Route distance 564 m
Horizontal length 544 m
Average incline ?? %
Largest incline ?? %
Number of pillars 7 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1300 Pers/h
Travel time 3,6 min
Driving speed line 2,6 m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) 101 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Leitner 
Cab model ?? 
Seating ?? 
Seat heater ?? 
Persons per cab
Number of cabs 40 Stk
Cab distance 28,8 m
Cab interval 11 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? CZK
Currency (Construction costs) Czech koruna 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/09/22
PHOTOS: ??

Lift-Statistics
1747 visit(s) since 28/12/18
Last visit 19/04/24

LIFT-WORLD IDs
Lift-ID: 18801
Place-ID: 2466

https://www.seilbahntechnik.net/en/lifts/18801/datas.htm