Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  8-MGD Pas du Lac II

Line
Line

Mountain station
Mountain station

Line
Line

General information  
Place Méribel-Mottaret 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Pas du Lac II 
Type 8-MGD 
Lift manufacturer Poma 
Year of construction 1997 
Commissioning date 1997 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 2213 m
Height of mountain station 2680 m
Vertical rise 467 m
Route distance 1059 m
Horizontal length ?? m
Average incline ?? %
Largest incline 87 %
Number of pillars 18 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2000 Pers/h
Travel time 3,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 820 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type Omega T 
Cab manufacturer Sigma 
Cab model ?? 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 49 Stk
Cab distance 65 m
Cab interval 13 s
Garage type underground 
Garage place valley station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right 
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 30/01/22
PHOTOS: ??

Lift-Statistics
9953 visit(s) since 11/03/05
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 1886
Place-ID: 1131

https://www.seilbahntechnik.net/en/lifts/1886/datas.htm