Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Hochangerbahn


Valley Station
Valley Station

Mountain Station
Mountain Station

Line
Line


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Seefeld
resort Rosshuette
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Hochangerbahn 
Type 6-CLD/B 
Lift manufacturer Doppelmayr 
Year of construction 1999 
Commissioning date 17/12/99

geometric data  
Height of valley station 1234 m
Height of mountain station 1645 m
Vertical rise 411 m
Route distance 1267,35 m
Horizontal length ?? m
Average incline 34,00 %
Largest incline 96,00 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,0 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2013 Pers/h
Travel time 4,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Austria Draht 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 43 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 475 kW
Drive power (Operation) 379 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Doppelmayr
Cab model ??
Bubble colour neutral
Seating leather
Seat heater yes
Persons per cab
Number of cabs 52 Stk
Cab distance 53,66 m
Cab interval 10,73 s
Garage type underground
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period 3,5 months
Seasontime winter
Situation of entrance 90°
Situation of exit parallel
Loading carpet ??
Evacuation ropeway no
Integrated rescue system no
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 11/03/19 22:19:19
PHOTOS: 20/04/04 21:12:53

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
10505 visit(s) since 07/05/03
Last visit 20/09/19

LIFT-WORLD IDs
Lift-ID: 190
Place-ID: 113

https://www.seilbahntechnik.net/en/lifts/190/datas.htm