Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-CLD Mont Valaisan Express

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place La Rosière 
resort Espace San Bernardo 
Region Rhône-Alpes 
Country   
Name of lift Mont Valaisan Express 
Type 6-CLD 
Lift manufacturer BMF 
Year of construction 2018 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2460 m
Height of mountain station 2804 m
Vertical rise 344 m
Route distance 876 m
Horizontal length 798 m
Average incline 42,98 %
Largest incline 66,85 %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,9 m
Trackwidth line ?? m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 2,92 min
Driving speed line 5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 450 kW
Drive power (Operation) 368 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer ?? 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 43 Stk
Cab distance 45 m
Cab interval 9 s
Garage type none 
Garage place nowhere 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Redaelli 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 01/07/23
PHOTOS: ??

Lift-Statistics
2171 visit(s) since 02/12/19
Last visit 23/11/24

LIFT-WORLD IDs
Lift-ID: 19010
Place-ID: 1066

https://www.seilbahntechnik.net/en/lifts/19010/datas.htm