Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD 12er Kogel I

Valley station
Valley station

Valley station
Valley station

Line
Line

General information  
Place Hinterglemm 
resort Ski Alpin Card 
Region Salzburg 
Country   
Name of lift 12er Kogel I 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2019 
Commissioning date 29/11/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1066 m
Height of mountain station 1530 m
Vertical rise 464 m
Route distance 1521 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars ?? Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 3500 Pers/h
Travel time ?? min
Driving speed line 6,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system Doppelmayr 
Power control system Doppelmayr 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ?? 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer CWA 
Cab model Omega IV-10 SI D 
Seating leather 
Seat heater ?? 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs ?? Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place Middle station(s) 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control yes 
Asset number (Trail map) B1  

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 27/02/24
PHOTOS: ??

Lift-Statistics
8760 visit(s) since 01/12/19
Last visit 10/11/24

LIFT-WORLD IDs
Lift-ID: 19013
Place-ID: 343

https://www.seilbahntechnik.net/en/lifts/19013/datas.htm