Lift-Database » Lifts in the world
10-MGD Linea Café
General information | |
---|---|
Place | La Paz |
resort | ?? |
Region | ?? |
Country | |
Name of lift | Linea Café |
Type | 10-MGD |
Lift manufacturer | Doppelmayr |
Year of construction | 2018 |
Commissioning date | 20/12/18 |
Infos for handicapped persons |
---|
Sorry, no information available. |
Characteristics |
---|
Sorry, no information available. |
geometric data | |
---|---|
Height of valley station | ?? m |
Height of mountain station | ?? m |
Vertical rise | ?? m |
Route distance | 714 m |
Horizontal length | ?? m |
Average incline | ?? % |
Largest incline | ?? % |
Number of pillars | 7 Stk |
Greatest spanwidth | ?? m |
Max ground clearance | ?? m |
Trackwidth drive | ?? m |
Trackwidth line | ?? m |
Trackwidth return | ?? m |
Angle of wrap (drive wheel) | ?? ° |
Drive altitude of site | ?? m |
Maximum capacity | 2000 Pers/h |
Travel time | 3,8 min |
Driving speed line | 5 m/s |
Driving speed station | ?? m/s |
electrical data | |
---|---|
Electrical control | ?? |
Remote control and telemonitoring system | ?? |
Power control system | ?? |
Number of drive | ?? Stk |
Drive power (Start) | ?? kW |
Drive power (Operation) | ?? kW |
Brake power | ?? kW |
Continuous brake power | ?? kW |
Driving station | ?? |
Drive type | ?? |
Traction of drive | ?? |
Emergency drive | ?? |
Traction of emergency drive | ?? |
cabins data | |
---|---|
Grip type | ?? |
Cab manufacturer | CWA |
Cab model | ?? |
Seating | duckboard (timber) |
Seat heater | no |
Heater | no |
Aircon | no |
Persons per cab | 10 |
Number of cabs | 26 Stk |
Cab distance | ?? m |
Cab interval | ?? s |
Garage type | ?? |
Garage place | ?? |
Garage direction | ?? |
Loading direction | ?? |
rope data | |
---|---|
Rope manufacturer | ?? |
Length of haul rope | ?? m |
Total weight of haul rope | ?? t |
Haul rope diameter | ?? mm |
Nominal strength of haul rope | ?? N/mm² |
Breaking strength of rope | ?? kN |
Tensionstation haulrope | ?? |
Tension type | ?? |
Tension way | ?? m |
miscellaneous data | |
---|---|
Transport uphill | 100 % |
Transport downhill | 100 % |
Drive direction | ?? |
Construction costs | ?? BOB |
Currency (Construction costs) | Bolivian boliviano |
Construction period | ?? months |
Seasontime | ❄ ☀ all-season |
Evacuation ropeway | ?? |
Integrated rescue system | ?? |
Rope position control | ?? |
Asset number (Trail map) | ?? |
Updates
Datas: 01/02/20
PHOTOS: ??
Lift-Statistics
3196 visit(s) since 01/12/19
Last visit 05/12/24
LIFT-WORLD IDs
Lift-ID: 19020
Place-ID: 1998
https://www.seilbahntechnik.net/en/lifts/19020/datas.htm
Datas: 01/02/20
PHOTOS: ??
Lift-Statistics
3196 visit(s) since 01/12/19
Last visit 05/12/24
LIFT-WORLD IDs
Lift-ID: 19020
Place-ID: 1998
https://www.seilbahntechnik.net/en/lifts/19020/datas.htm