Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Stuanmandl


Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Gerlos
resort

Zillertaler Superskipass
Zillertal Arena
Region Tyrol, Tirol
Country AT Austria, Österreich
Name of lift Stuanmandl 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2018/19 
Commissioning date 07/12/19

geometric data  
Height of valley station 2079,2 m
Height of mountain station 2282,72 m
Vertical rise 203,5 m
Route distance 1527,63 m
Horizontal length 1509,05 m
Average incline 13,49 %
Largest incline 39,79 %
Number of pillars 11 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,4 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 5,43 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 48 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 446 kW
Drive power (Operation) 338 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type D5000
Cab manufacturer CWA
Cab model Omega V - 10
Seating ??
Seat heater yes
Heater no
Aircon no
Persons per cab 10 
Number of cabs 51 Stk
Cab distance 77,14 m
Cab interval 12,86 s
Garage type ground floor
Garage place mountain station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs 12,000,000  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 11/04/20 13:33:01
PHOTOS: 15/12/19 17:21:22

Lift-Statistics
1537 visit(s) since 08/12/19
Last visit 04/07/20

LIFT-WORLD IDs
Lift-ID: 19023
Place-ID: 66

https://www.seilbahntechnik.net/en/lifts/19023/datas.htm