Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Grandes Combes

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Courchevel 
resort Les Trois Vallées 
Region Rhône-Alpes 
Country   
Name of lift Grandes Combes 
Type 4-CLF 
Lift manufacturer Poma 
Year of construction 2019 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1500 m
Height of mountain station 1680 m
Vertical rise 180 m
Route distance 799 m
Horizontal length 773 m
Average incline 23,29 %
Largest incline 79 %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive 4,9 m
Trackwidth line 4,9 m
Trackwidth return 4,9 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 5,33 min
Driving speed line 2,5 m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system Semer 
Power control system Semer 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 109 Stk
Cab distance 15 m
Cab interval 6 s


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Mountain station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 05/03/23
PHOTOS: ??

Lift-Statistics
3933 visit(s) since 26/12/19
Last visit 04/12/24

LIFT-WORLD IDs
Lift-ID: 19028
Place-ID: 1009

https://www.seilbahntechnik.net/en/lifts/19028/datas.htm