Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Schindlergratbahn

Mountain station
Mountain station

Line
Line

Intermediate station
Intermediate station

General information  
Place St. Anton am Arlberg 
resort Ski Arlberg 
Region Tyrol 
Country   
Name of lift Schindlergratbahn 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2019 
Commissioning date 08/12/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Doors for exit in the intermediate station on both sides.
The intermediate station is higher as the mountain station!

geometric data  
Height of valley station 2035 m
Height of middle station(s) 2643 m
Height of mountain station 2579 m
Vertical rise 544 m
Route distance 1945 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 19 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2800 Pers/h
Travel time 7,65 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive diesel engine 
Traction of emergency drive ?? 

cabins data  
Grip type D5000 
Cab manufacturer CWA 
Cab model Omega IV-10 SI D 
Seating leather 
Seat heater yes 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 68 Stk
Cab distance ?? m
Cab interval ?? s
Garage type underground 
Garage place valley station 
Garage direction forward 
Loading direction backward 


rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 50 %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control yes 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 24/06/22
PHOTOS: ??

Lift-Statistics
7810 visit(s) since 01/01/20
Last visit 21/12/24

LIFT-WORLD IDs
Lift-ID: 19053
Place-ID: 288

https://www.seilbahntechnik.net/en/lifts/19053/datas.htm