Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


6-CLD/B Mitterkaser









Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place
resort
Region Bavaria, Bayern
Country DE Germany, Deutschland
Name of lift Mitterkaser 
Type 6-CLD/B 
Lift manufacturer Leitner 
Year of construction 2019 
Commissioning date 28/12/19

geometric data  
Height of valley station 1532 m
Height of mountain station 1795 m
Vertical rise 263 m
Route distance 713 m
Horizontal length 645 m
Average incline 40,62 %
Largest incline ?? %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1400 Pers/h
Travel time 2,23 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) 354 kW
Drive power (Operation) 306 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive direct drive
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type LPA-M
Cab manufacturer Leitner
Cab model ??
Bubble colour
Seating ??
Seat heater ??
Persons per cab
Number of cabs 22 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right
Construction costs ??  EUR 
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter
Situation of entrance ??
Situation of exit ??
Loading carpet ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 10/06/20 19:21:02
PHOTOS: 24/06/20 18:40:11

Lift-Statistics
1022 visit(s) since 01/01/20
Last visit 23/09/20

LIFT-WORLD IDs
Lift-ID: 19054
Place-ID: 1722

https://www.seilbahntechnik.net/en/lifts/19054/datas.htm