Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD BergJet





Infos for handicapped persons
Sorry, no information available.

Characteristics
Design by Porsche Design Studio
High of the Pillars: 8 - 37 m
Heaviest Pillar: 32 t (Nr. 7)

General information  
Place Flums
resort Flumserberg
Region St. Gall
Country CH Switzerland, Confoederatio Helvetica
Name of lift BergJet 
Type 8-MGD 
Lift manufacturer BMF 
Year of construction 2019 
Commissioning date 21/12/19

geometric data  
Height of valley station 1398 m
Height of mountain station 2017 m
Vertical rise 619 m
Route distance 3223 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 20 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 10,43 min
Driving speed line 6 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Fatzer 
Length of haul rope 6900 m
Total weight of haul rope 73,8 t
Haul rope diameter 53 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 1057,1 kW
Drive power (Operation) 791,4 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type ??
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer ??
Cab model ??
Seating ??
Seat heater ??
Heater ??
Aircon ??
Persons per cab
Number of cabs 105 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ??
Garage place ??
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs 26,000,000  CHF 
Currency (Construction costs) Swiss franc 
Construction period 8 months
Seasontime ❄ ☀ all-season
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) B1 




This information are for members only visible!



Updates
Datas: 11/02/20 21:20:48
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
203 visit(s) since 05/01/20
Last visit 17/02/20

LIFT-WORLD IDs
Lift-ID: 19057
Place-ID: 335

https://www.seilbahntechnik.net/en/lifts/19057/datas.htm