  6-CLD Col de l'Eychauda

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Monêtier 
resort Serre Chevalier Vallée 
Region Provence-Alpes-Côte d'Azur 
Country   
Name of lift Col de l'Eychauda 
Type 6-CLD 
Lift manufacturer Poma 
Year of construction 2019 
Commissioning date 2019 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2166 m
Height of mountain station 2451 m
Vertical rise 283 m
Route distance 1477 m
Horizontal length 1454 m
Average incline 19,2 %
Largest incline 59 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 (2800) Pers/h
Travel time 4,1 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type LPA 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 60 (70) Stk
Cab distance 46,29 m
Cab interval 7,7 s
Garage type ?? 
Garage place ?? 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ??  
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 21/03/23
PHOTOS: ??

Lift-Statistics
3114 visit(s) since 05/01/20
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 19060
Place-ID: 1137

https://www.seilbahntechnik.net/en/lifts/19060/datas.htm