Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  4-CLF Cibouït

Valley Station
Valley Station

Line
Line

Mountain Station
Mountain Station

General information  
Place Monêtier 
resort Serre Chevalier Vallée 
Region Provence-Alpes-Côte d'Azur 
Country   
Name of lift Cibouït 
Type 4-CLF 
Lift manufacturer Poma 
Year of construction 2019 
Commissioning date 12 / 2019 
Second-hand lift. Formerly lift no. 6589 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 2147 m
Height of mountain station 2466 m
Vertical rise 319 m
Route distance 896 m
Horizontal length ?? m
Average incline 41,99 %
Largest incline 71 %
Number of pillars 9 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 4,9 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1402 (1800) Pers/h
Travel time 6,5 min
Driving speed line 2,3 m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 224 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Poma 
Cab model ?? 
Seating leather 
Seat heater no 
Persons per cab
Number of cabs 76 (90) Stk
Cab distance 19,7 m
Cab interval 8,6 s


rope data  
Rope manufacturer ArcelorMittal 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40,5 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction right 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime winter 
Loading carpet yes 
Evacuation ropeway no 
Integrated rescue system ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 04/10/24
PHOTOS: ??

Lift-Statistics
3647 visit(s) since 05/01/20
Last visit 26/12/24

LIFT-WORLD IDs
Lift-ID: 19061
Place-ID: 1137

https://www.seilbahntechnik.net/en/lifts/19061/datas.htm