Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


10-MGD Pian Dosson - Selletta





Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Andalo
resort
Region , Trentino-Alto Adige
Country IT Italy, Italia
Name of lift Pian Dosson - Selletta 
Type 10-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2019 
Commissioning date 28/12/19

geometric data  
Height of valley station 1448 m
Height of mountain station 1978 m
Vertical rise 530 m
Route distance 1608 m
Horizontal length 1510 m
Average incline 35,14 %
Largest incline 67,5 %
Number of pillars 12 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 6,4 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 (3600) Pers/h
Travel time 4,45 min
Driving speed line 6,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 56 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive 1 Stk
Drive power (Start) 716 (907) kW
Drive power (Operation) 565 (730) kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station ??
Drive type electrical
Traction of drive ??
Emergency drive diesel engine
Traction of emergency drive hydrostatic

cabins data  
Grip type D5000
Cab manufacturer CWA
Cab model Omega V - 10
Seating ??
Seat heater ??
Heater ??
Aircon ??
Persons per cab 10 
Number of cabs 49 (74) Stk
Cab distance 90,0 (60,0) m
Cab interval 15,0 (10,0) s
Garage type ??
Garage place valley station
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 67 %
Drive direction right
Construction costs ??  ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ??
Evacuation ropeway ??
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 29/02/20 17:21:44
PHOTOS: ????

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
464 visit(s) since 12/01/20
Last visit 04/04/20

LIFT-WORLD IDs
Lift-ID: 19081
Place-ID: 1285

https://www.seilbahntechnik.net/en/lifts/19081/datas.htm