Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6/10-CGD Chabrières



General information  
Place Vars 
resort La Fôret Blanche 
Region Provence-Alpes-Côte d'Azur 
Country   
Name of lift Chabrières 
Type 6/10-CGD 
Lift manufacturer Leitner 
Year of construction 2019 
Commissioning date 14/12/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1859,8 m
Height of mountain station 2212,70 m
Vertical rise 352,90 m
Route distance 1327,19 m
Horizontal length ?? m
Average incline 27,2 %
Largest incline 76,87 %
Number of pillars 14 Stk
Greatest spanwidth 129 m
Max ground clearance 23 m
Trackwidth drive ?? m
Trackwidth line 6,60 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2600 Pers/h
Travel time 4,1 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 707 kW
Drive power (Operation) 574 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model DiamondC10 EVO 
Bubble colour ?? 
Seating ?? 
Seat heater ?? 
Persons per cab 6/10 
Number of cabs 64 Stk
Cab distance 52,44 m
Cab interval 9,53 s
Garage type ground floor 
Garage place mountain station 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer ?? 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 50 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 37 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ??  
Situation of entrance parallel 
Situation of exit parallel 
Loading carpet no 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 24/07/20
PHOTOS: ??

Lift-Statistics
3135 visit(s) since 19/01/20
Last visit 29/03/24

LIFT-WORLD IDs
Lift-ID: 19084
Place-ID: 1243

https://www.seilbahntechnik.net/en/lifts/19084/datas.htm