Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


8-MGD Bürgeralpe Express


Mountain Station
Mountain Station

Sunset out of the gondola
Sunset out of the gondola

Valley Station
Valley Station


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

General information  
Place Mariazell
resort
Region Styria, Steiermark
Country AT Austria, Österreich
Name of lift Bürgeralpe Express 
Type 8-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2019 
Commissioning date 07/12/19

geometric data  
Height of valley station 868 m
Height of mountain station 1267 m
Vertical rise 370 m
Route distance 1442 m
Horizontal length ?? m
Average incline ?? %
Largest incline ?? %
Number of pillars 10 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 800 (1200) Pers/h
Travel time 5 min
Driving speed line 5 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control Doppelmayr 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer CWA
Cab model OMEGA IV-8 LWI
Seating carpet
Seat heater no
Heater no
Aircon no
Persons per cab
Number of cabs 21 Stk
Cab distance 178 m
Cab interval ?? s
Garage type station circulation
Garage place valley and mountain
Garage direction forward
Loading direction backward

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left
Construction costs 7,200,000  EUR 
Currency (Construction costs) Euro 
Construction period 8 months
Seasontime ❄ ☀ all-season
Evacuation ropeway no
Integrated rescue system ??
Rope position control ??
Asset number (Trail map) ?? 




This information are for members only visible!





Support
Wrong data or something is missing?
Support us!
Updates
Datas: 19/05/20 21:37:07
PHOTOS: 15/02/20 17:18:43

Lift-Statistics
697 visit(s) since 02/02/20
Last visit 26/05/20

LIFT-WORLD IDs
Lift-ID: 19124
Place-ID: 488

https://www.seilbahntechnik.net/en/lifts/19124/datas.htm