Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


3-CLD Dreiländereck












Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Arnoldstein
resort Moelltaler Gletscher
Region Carinthia, Kärnten
Country AT Austria, Österreich
Name of lift Dreiländereck 
Type 3-CLD 
Lift manufacturer Girak 
Year of construction 1993 
Commissioning date 1993

geometric data  
Height of valley station 695 m
Height of mountain station 1461 m
Vertical rise 765,97 m
Route distance 2228,3 m
Horizontal length ?? m
Average incline ?? %
Largest incline 86,5 %
Number of pillars 22 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 7,5 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Teufelberger 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 38 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way 3,1 m

electrical data  
Electrical control Elin 
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 785 kW
Drive power (Operation) 583 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive ??
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type Nockenklemme Typ A
Cab manufacturer Girak
Cab model ??
Seating polystyrene
Seat heater no
Persons per cab
Number of cabs 132 Stk
Cab distance 36 m
Cab interval 7,2 s
Garage type underground
Garage place valley station
Garage direction backward
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction right
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime ❄ ☀ all-season
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway ??
Integrated rescue system ??
Rope position control yes
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 21/02/17 21:20:49
PHOTOS: 19/03/10 17:45:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
12415 visit(s) since 11/08/03
Last visit 24/10/19

LIFT-WORLD IDs
Lift-ID: 1942
Place-ID: 367

https://www.seilbahntechnik.net/en/lifts/1942/datas.htm