Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  6-MGD Eckbauer



General information  
Place Garmisch-Partenkirchen 
resort Zugspitze 
Region Bavaria 
Country   
Name of lift Eckbauer 
Type 6-MGD 
Lift manufacturer Doppelmayr 
Year of construction 2018/19 
Commissioning date 16/05/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
49 gondolas during summer operations (4 gondolas for mountain bike transport)

geometric data  
Height of valley station 731 m
Height of mountain station 1227 m
Vertical rise 495,68 m
Route distance 2134,48 m
Horizontal length 2052,8 m
Average incline 24,15 %
Largest incline ?? %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line 5,20 m
Trackwidth return 5,20 m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 570 (950) Pers/h
Travel time 14,27 min
Driving speed line 3 (5) m/s
Driving speed station ?? m/s

electrical data  
Electrical control ?? 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive 1 Stk
Drive power (Start) 266 kW
Drive power (Operation) 187 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive electromechanical 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type DT 108 
Cab manufacturer CWA 
Cab model ?? 
Seating duckboard (timber) 
Seat heater no 
Heater no 
Aircon no 
Persons per cab
Number of cabs 45 Stk
Cab distance 113,68 m
Cab interval 37,89 s
Garage type ground floor 
Garage place valley and mountain 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 45 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 23/04/23
PHOTOS: ??

Lift-Statistics
4180 visit(s) since 21/04/20
Last visit 28/03/24

LIFT-WORLD IDs
Lift-ID: 19420
Place-ID: 157

https://www.seilbahntechnik.net/en/lifts/19420/datas.htm