Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Alpe Express










General information  
Place Alpe d'Huez 
resort Alpe d'Huez 
Region Rhône-Alpes 
Country   
Name of lift Alpe Express 
Type 10-MGD 
Lift manufacturer Poma 
Year of construction 2018 
Commissioning date ?? 


Infos for handicapped persons
Sorry, no information available.

Characteristics
Sorry, no information available.

geometric data  
Height of valley station 1783 m
Height of middle station(s) 1829,5 m
Height of mountain station 1810 m
Vertical rise 27 m
Route distance 868 m
Horizontal length ?? m
Average incline 5,47 %
Largest incline 35,17 %
Number of pillars 10 Stk
Greatest spanwidth 189 m
Max ground clearance 21 m
Trackwidth drive ?? m
Trackwidth line 6,1 m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2400 Pers/h
Travel time 3,5 min
Driving speed line 5,5 m/s
Driving speed station ?? m/s

electrical data  
Electrical control Semer 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 135 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station 
Drive type electrical 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type ?? 
Cab manufacturer Sigma 
Cab model Diamond C10 EVO 
Seating ?? 
Seat heater no 
Heater no 
Aircon no 
Persons per cab 10 
Number of cabs 56 Stk
Cab distance 90 m
Cab interval 15,5 s
Garage type ?? 
Garage place Middle station(s) 
Garage direction ?? 
Loading direction ?? 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 46 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station 
Tension type hydraulical (controlled) 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction left 
Construction costs ?? EUR
Currency (Construction costs) Euro 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway no 
Integrated rescue system no 
Rope position control no 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 12 apr 2024
PHOTOS: ??

Lift-Statistics
4886 visit(s) since 26 apr 2020
Last visit 18 apr 2025

LIFT-WORLD IDs
Lift-ID: 19507
Place-ID: 229

https://www.seilbahntechnik.net/en/lifts/19507/datas.htm