Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Les 2 Lacs


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Val Thorens
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Les 2 Lacs 
Type 4-CLD 
Lift manufacturer Poma 
Year of construction 1991 
Commissioning date 1991
Date of closing down 2013
Date of pull down 2013

geometric data  
Height of valley station 2189 m
Height of mountain station 2455 m
Vertical rise 266 m
Route distance 1123 m
Horizontal length ?? m
Average incline 25 %
Largest incline 85 %
Number of pillars 13 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 2420 Pers/h
Travel time 4,15 min
Driving speed line 4,55 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer Tréfileurope 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter 40 mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope Valley station
Tension type hydraulical (controlled)
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) 424 kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Mountain station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Poma
Cab model ??
Seating leather
Seat heater no
Persons per cab
Number of cabs 89 Stk
Cab distance 27 m
Cab interval 6 s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 17/03/17 22:00:46
PHOTOS: 16/09/06 21:21:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
5251 visit(s) since 11/10/03
Last visit 16/09/19

LIFT-WORLD IDs
Lift-ID: 1951
Place-ID: 1234

https://www.seilbahntechnik.net/en/lifts/1951/datas.htm