Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database » Lifts in the world

  10-MGD Holenstein - Männlichen



General information  
Place Grindelwald 
resort Jungfrau 
Region Berne 
Country   
Name of lift Holenstein - Männlichen 
Type 10-MGD 
Lift manufacturer Garaventa 
Year of construction 2019 
Commissioning date 14/12/19 


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

geometric data  
Height of valley station 1624 m
Height of mountain station 2223 m
Vertical rise 1281 m
Route distance 6203 m
Horizontal length ?? m
Average incline 20,1 %
Largest incline 50,7 %
Number of pillars 34 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1800 Pers/h
Travel time 19 min
Driving speed line 6 m/s
Driving speed station ?? m/s

electrical data  
Electrical control SISAG 
Remote control and telemonitoring system ?? 
Power control system ?? 
Number of drive ?? Stk
Drive power (Start) 974 kW
Drive power (Operation) 711 kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station 
Drive type ?? 
Traction of drive ?? 
Emergency drive ?? 
Traction of emergency drive ?? 

cabins data  
Grip type D5000 
Cab manufacturer CWA 
Cab model Omega V - 10 
Seating ?? 
Seat heater ?? 
Heater ?? 
Aircon ?? 
Persons per cab 10 
Number of cabs 111 Stk
Cab distance ?? m
Cab interval ?? s
Garage type ground floor 
Garage place in all stations 
Garage direction forward 
Loading direction forward 


rope data  
Rope manufacturer Fatzer 
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ?? 
Tension type ?? 
Tension way ?? m

miscellaneous data  
Transport uphill 100 %
Transport downhill 100 %
Drive direction ?? 
Construction costs ?? CHF
Currency (Construction costs) Swiss franc 
Construction period ?? months
Seasontime ❄ ☀ all-season 
Evacuation ropeway ?? 
Integrated rescue system ?? 
Rope position control ?? 
Asset number (Trail map) ?? 

This information are for members only visible!


Support
Wrong data or something is missing?
Support us!
Updates
Datas: 08/10/24
PHOTOS: ??

Lift-Statistics
4456 visit(s) since 29/04/20
Last visit 04/12/24

LIFT-WORLD IDs
Lift-ID: 19540
Place-ID: 1724

https://www.seilbahntechnik.net/en/lifts/19540/datas.htm