Lift-World.info

Ropeway technology moves us!
Slider HintergrundSlider HintergrundSlider HintergrundSlider Hintergrund

Lift-Database

Lifts in the world


4-CLD Rosael


Valley station
Valley station

Line
Line

Mountain station
Mountain station


Infos for handicapped persons
Sorry, no information available.

Characteristics
nothing

General information  
Place Orelle
resort Les Trois Vallées
Region Rhône-Alpes
Country FR France
Name of lift Rosael 
Type 4-CLD 
Lift manufacturer Montaz Mautino 
Year of construction 1989 
Commissioning date 1989
Date of closing down 2009
Date of pull down 2009

geometric data  
Height of valley station 2335 m
Height of mountain station 2995 m
Vertical rise 640 m
Route distance 2280 m
Horizontal length 2185 m
Average incline 30 %
Largest incline 92 %
Number of pillars 27 Stk
Greatest spanwidth ?? m
Max ground clearance ?? m
Trackwidth drive ?? m
Trackwidth line ?? m
Trackwidth return ?? m
Angle of wrap (drive wheel) ?? °
Drive altitude of site ?? m
Maximum capacity 1500 Pers/h
Travel time 8 min
Driving speed line 5,0 m/s
Driving speed station ?? m/s

rope data  
Rope manufacturer ??
Length of haul rope ?? m
Total weight of haul rope ?? t
Haul rope diameter ?? mm
Nominal strength of haul rope ?? N/mm²
Breaking strength of rope ?? kN
Tensionstation haulrope ??
Tension type ??
Tension way ?? m

electrical data  
Electrical control ??
Remote control and telemonitoring system ??
Power control system ??
Number of drive ?? Stk
Drive power (Start) ?? kW
Drive power (Operation) ?? kW
Brake power ?? kW
Continuous brake power ?? kW
Driving station Valley station
Drive type electrical
Traction of drive electromechanical
Emergency drive ??
Traction of emergency drive ??

cabins data  
Grip type ??
Cab manufacturer Gimar
Cab model ??
Seating ??
Seat heater no
Persons per cab
Number of cabs 106 Stk
Cab distance 48 m
Cab interval 9,6 s
Garage type none
Garage place nowhere
Garage direction ??
Loading direction ??

miscellaneous data  
Transport uphill 100 %
Transport downhill ?? %
Drive direction left
Construction costs ?? 
Currency (Construction costs) ?? 
Construction period ?? months
Seasontime winter
Situation of entrance parallel
Situation of exit parallel
Loading carpet no
Evacuation ropeway no
Integrated rescue system no
Rope position control no
Asset number (Trail map) ?? 




This information are for members only visible!



Updates
Datas: 05/01/17 21:42:05
PHOTOS: 18/08/06 22:28:00

Support
Wrong data or something is missing?
Support us!
Lift-Statistics
3654 visit(s) since 07/11/03
Last visit 17/09/19

LIFT-WORLD IDs
Lift-ID: 1957
Place-ID: 1156

https://www.seilbahntechnik.net/en/lifts/1957/datas.htm